Time lines vary vastly with the complexity of the project. Engaging Tracan's Building Block approach and leveraging as much off the shelf product as possible, reduces the length of these time lines. A couple of metrics we use to give some indication are listed in the table below, not all stages are required in each project. Many custom projects complete in as little as 6 weeks.
| Stage | Average Time |
|---|---|
| Design Project Plan | 1 Week |
| NRE Quotation & ROM Production Cost | 3 - 5 Days |
| Detailed Production Cost | After Design or 1 to 3 Days Engineering |
| Prototype | 10 to 20 Days |
| Verification | 5 Days |
Costs are equally dynamic and as such would be difficult to give average guidance. Please see our solutions examples for some representative samples for your information.